Current Projects

Camino Arroyo Bridge Project - Phase II
City of Gilroy
$4.8 Million

Construction of the Camino Arroyo Bridge, Camino Arroyo/Sixth Street signalized intersection, City Trail. Camino Arroyo roadway segment, roadway widening, street lighting, sidewals and Sixth Street Overcrossing improvements.

Services: Construction Management, Resident Engineering, Structures Representative, Construction Inspection, Scheduling and Constructability Reviews

101/ 580 Separation and 101 HOV Lane
Caltrans
$100+ Million

Ghirardelli Associates is assisting Caltrans in administering several contracts including the US 101 gap closure and Interchange Improvement projects.

Services: Resident Engineering, Construction Inspection, Scheduling, Estimating and Electrical Inspection

SFOBB Self-Anchored Suspension Bridge Project
Caltrans
$1.4 Billion

The scope of this project involves the main cornerstone suspension bridge that connects the "Skyway" structure to Yerba Buena Island in San Francisco Bay. The bridge is a self-anchored suspension bridge which is comprised of a single tower, orthotropic box girders, cable suspension, and two hinges, one on each end of the cable system. The work also includes tower saddles, electrical, mechanical, SWPPP construction activities and heavy coordination with funding, regulatory and environmental agencies.

Services: Resident Engineering, Construction Inspection, Scheduling, Estimating and Document Control

On Call Construction Management
City of Richmond
$1.9 Million

Ghirardelli Associates is working with the City of Richmond Redevelopment Agency to complete a number of deferred maintenance projects including lighting replacement, paving repairs, irrigation system replacement, rip rap replacement and construction of a new restroom facility. Responsibilities include defining scope, developing cost estimates and specifications, procurement management, and construction management.

Services: Resident Engineering and Construction Inspection