Highways and Bridges

Valley Transportation Authority - San Jose, CA
$37 M

Project requirements: Widening of US 101 between Morgan Hill and South San Jose. Project involved widening 3 bridges and PCC pavement construction and required extensive stage construction, night work, and Public Relations.

Ghirardelli Associates provided contract management and Resident Engineering services on this contract to widen State Route 101 between San Jose and Morgan Hill. This project involved adding two new lanes of PCC pavement in each direction, in the median of Route 101, for approximately 7.5 miles, as well as modifications to the drainage facilities and widening three bridges. Duties include, but are not limited to; responsibility for control of the technical aspects of both roadway and bridge construction activities, contract administration, preparing and negotiating change orders, analyzing potential claims, and supervising other consultant staff. Ghirardelli Associates was also responsible for the coordination of numerous environmental and regulatory requirements in permits from State Department of Fish and Game, National Marine Fisheries Service, Regional Water Quality Control Board, Santa Clara Valley Water District, Army Corp of Engineers, and Caltrans Encroachment Permits.

Services Provided: Resident engineering, bridge representative, and inspector training program.


Highway 101 Widening

Caltrans District 4 Support Services

Ghirardelli Associates provides an assistant resident engineer for various Caltrans projects including the $30M widening project on State Route 37, the $10M I-780 rehabilitation, and rubberized asphalt project in Vallejo. Duties include inspection of contractor's asphalt paving, striping, earthwork, drainage, and other items of roadway work. We also assisted the resident engineer with contract closeout and quantity audits.

Services Provided: Assistant resident engineer


State Route 37

ACCMA I-680 Soundwall - 95% Constructability Review

Project requirements: Perform construction management services for the construction as required for the I-680 Sunol grade soundwall project.

Ghirardelli Associates performed a constructability review and preconstruction services during the 65% to 95% design phase of a $10M soundwall project and a $5M street improvement/utility under grounding project. Ghirardelli Associates provided insight into: alternative construction methods, ways to avoid underground utility conflicts, plan checking, special provision review, site inspection and utility contractor work coordination. Ghirardelli Associates provided valuable input to the designer and owners of these two projects that minimized potential change orders and other conflicts during construction.

Services Provided: Constructability review, resident engineer, civil inspection


Contra Costa Transportation Authority Construction Management
Hwy 4 Contract

Project requirements: Relocation of utilities, demolishing the existing overcrossing and replacing the bridge along Highway 4 in Pittsburg.

Ghirardelli Associates provided a lead Construction Inspector and was responsible for replacing the Railroad Avenue overcrossing along Highway 4 in Pittsburg. This work involves the relocation of several utilities, demolishing the existing overcrossing and replacing the bridge with a longer structure for future widening of Route 4 for additional highway traffic lanes and the BART system. Ghirardelli Associates oversaw utility work, as well as drainage, electrical and local roadway widening and improvements. We worked closely with city and Caltrans oversight inspectors to make sure all work and testing is done in accordance with the contract documents.

Services Provided: Bridge inspection and civil inspection


John Daly Bridge Widening
$4 M

Project requirements: Bridge widening and interchange remodel. Project involved electrical inspection, underground inspection, constructed under Caltrans oversight and included night work.

Ghirardelli Associates provided the resident engineer for this $4M project to widen the overcrossing for John Daly Boulevard at I-280 in Daly City, CA. The project involved Federal funding and City funds. We were responsible for both field and office management of the 210-calendar day project adjacent to a new commercial development. Traffic control, structures construction methods, night work, and matching existing conditions are project challenges that Ghirardelli Associates met successfully.

Services Provided: Resident engineer, bridge inspection, civil inspection


John Daly Bridge Concrete Pour

Structures Inspector - Caltrans District 6-Touleme County 2002
$12M

Project requirements: Provide structural inspection services for this bridge replacement project on State Route 198.

The project involved constructing a new 480 feet long, three spanned prestressed box girder bridge to replace an existing three spanned I-girder bridge, 150 feet above Horse Creek to realign Route 198. The Construction involved blasting the hillside for the realignment as well as blasting to excavate for new foundations. Ghirardelli Associates engineer inspected all aspects of the bridge replacement project including, structure excavation (blasting), embankment construction, reinforcing and concrete placement, traffic control, Fish and Game permit compliance, Army Corp. permit compliance and SWPPP compliance. We performed construction surveying to verify alignments and grades, coordinated material testing and coordinated with Caltrans Geotechnical Branch for rock quality verification after blasting. Ghirardelli's engineer was the sole structures inspector on the project responsible for ensuring that the construction was completed in accordance with the contract plans and specifications.

Services Provided: Civil Inspection